AI data centers aren’t just running out of grid power, they’re running out of capital efficiency, cooling headroom, and water.

At Hydro Puls Direct-Drive (HPDD), we’re finalizing our dedicated Data Center business plan, backed by U.S. investors for immediate global rollout of our fully pre-funded Energy & Cooling as a Service (EaaS) model.

Here is what 100 MW of behind-the-meter HPDD EaaS delivers to an AI campus compared to traditional grid newbuild:

⚡ €0 Upfront Energy CAPEX: 100% funded by our EaaS fleet, freeing up €40M+ in substation, chiller, and diesel backup CAPEX so developers can deploy more GPUs immediately.

❄️ All-In €125/MWh Utility Rate: Covers 24/7 prime power (~63% net electrical efficiency), 230 °C closed-loop cooling (eliminating the ~30% chiller PUE penalty), and +600 bar hydraulic UPS.

💧 Water-Positive Operation: Co-produces 41,600 L/hr (364,416 m³/year) of pure distilled make-up water at zero extra cost, relieving strain on local municipal supplies.

💰 €9.30M/Year Net Savings: €125.00/MWh all-in vs. €135.62/MWh effective grid newbuild TCO (€186M+ saved over 20 years), with 100% CO₂-free Green Ammonia options available at €162.50/MWh.

No 3-to-7-year grid interconnection queues. Zero exhaust emissions (ΔMass = 0.000 kg). 99.99% guaranteed uptime.

If you are developing or scaling high-density AI infrastructure and want to bypass grid and water bottlenecks, let’s connect.

#DataCenters #AIInfrastructure #EnergyAsAService #LiquidCooling #CleanEnergy #Hyperscale #HPDD